Geoenvironmental

Environmental Site Assessments:

  • Phase I and Phase II Environmental Assessments by MOE “Qualified Persons” (QPESA) meeting the current regulatory requirements
  • Risk Assessments completed by MOE "Qualified Persons" (QPRA) including:
    • Human Health and Ecological RA modeling
    • Site characterization (soil, surface water and ground water)
    • Design of engineered controls and Risk Management Measures
  • Preparation of Certificate of Property Use documents and Monitoring Plans
  • Preparation and filing of Records of Site Condition
  • Environmental Compliance Monitoring and Reporting
  • Environmental Investigations for Due Diligence and Financing purposes
  • Subsurface Investigations and Baseline Environmental Surveys

Site Clean-Up and Brownfield Remediation:

  • Preparation of Remedial Action Plans
  • Soil and Ground Water Management Plans
  • Storage Tank Assessment and verification sampling
    • Waste and tank removal monitoring
    • Confirmatory testing and certification
  • Supervision and 3rd Party Certification of soil importation and management per MOE Schedule F requirements
  • Preparation of tender documents and administration of clean-up and abatement contracts

Landfill Evaluation and Design:

  • Waste characterization
  • Landfill monitoring programs: methane gas and leachate
  • Geomembrane liner systems
  • Environmental assessment, compliance and approvals

Peer Reviews:

  • Peer review of environmental site assessment reports including Phase One ESA, Phase Two ESA, Risk Assessments, remediation plans, and hydrogeologic studies
  • Peer Review services for municipalities, planning agencies and legal counsel

Designated Substances and Hazardous Materials Surveys

  • DSHM surveys conducted under the Occupational Health and Safety Act (OHSA-RSO 0.1/90
  • Work completed in compliance with O.Reg.490/09 and O.Reg.278/05
  • Designated Substances sampling
  • Asbestos and lead abatement plans